In September 2011 Southbay commenced works on Roker Pier, Sunderland. The works awarded by Sunderland City Council involve removing 42m of granite coping stones, dress and replace. After years of wave action from the North Sea the coping stones had become unseated, had broken away from the main deck and were in danger of falling off the pier.

No tracked plant is permitted onto the pier so a Franna crane was used to lift the granite blocks. The drilling of the granite blocks was not permitted as the pier is a listed structure so each block had to be jacked up and lifted with webbing slings, the blocks weighed between 2t and 5.7t each.

During the contract rough seas forced the work to be delayed. Southbay also carried out some emergency deck repairs after the pier suffered damage to the concrete deck from the sea.

  • Coping stones before works commenced

  • Coping removal

  • Franna removing copes

  • Franna removing copes

  • Copes ready for dressing

  • Cope stones removed

  • Cope stones replaced

  • Temporary works

  • Concrete backing to copes

  • High seas

  • Removing broken concrete

  • Rough seas

  • Breaking waves on the pier

  • Concrete backing

  • Replaced coping stone

  • Replaced coping stones

  • Replaced coping stones

  • New pier fencing

  • Deck repairs

  • Deck repairs


back to all our projects Click here to view all our data sheets

web design by onebestway